8m x 5m Bass shelter HWD clad posts Pine roof framing Supply and install including slab Soil report and permits
8m x 5m Bass shelter HWD clad posts Pine roof framing Supply and install including slab Soil report and permits
Decommission and demolish existing amenity. Design and Construct new amenity. 3 x custom Bass shelters Associated works, concrete paths, furniture installation, BBQ rough in, bollard install amongst other items
Contributors Client: Yarra Ranges Shire Council Structure: GR ‘Bass’ skillion shelters
Contributors Client: City of Boroondarah
Contributors Client: Bayside Bellarine Foreshore Committee
Background Client: Lifestyle Communities Landscape Architect: Hamilton Landscape Architects Landscape Structures: GR Design and Construct Location: Clyde North Project Particulars 30m x 2.5m Pedestrian Bridge Screw piles Concrete abutments and piers HDG bearers and joists Millboard decking as specified Galvanised posts, mid rail and top…
Project Particulars: GR demolished and disposed of an existing bridge Used larger crane to position small excavator on island to drive in screw piles Install screw piles at either end Crane lift for bridge placement Screw off HWD cover boards FRP decking Install two boardwalk…
GR won this contract via the MAV portal Design a suitable shelter to fit with the existing granitic sand footprint Supply and install the steel shelter Building permits and engineering Connect to existing storm water
1D Restroom to A/S 1428 New sewer tap in Internal cladding – colourbond External cladding – Painted FC sheet boards Solar to roof Stainless steel toilet and architectural hardware Concrete slab with disabled access 60m of granitic sand approach path with blue-stone curb Rough in,…
Project Particulars: Demolish existing granitic sand path Install drainage Site survey and set out Construct stair treads, landings and handrail Concrete stairs at both top and bottom approaches Pram crossing