Frankston City Council – Somme Stairs Refurbishment

Replace rotten hardwood bearers and joists with new members Replace of existing pine stringers and stair treads with hardwood New hardwood cap-rail and mid-rail Refurbishment of landings New HDG hardware throughout

Continue reading →

Monash City Council – Warrawee Park Shelter

 Custom skillion shelter, 10m x 5m. Steel, hardwood clad posts. Factory stained pine roof framing. Pine framed hardwood timber decorative shade screen. Colourbond roof BA drawings and engineering certification Installation to footings only through existing granitic slab Leave site clean and tidy

Continue reading →

Darebin City Council – Complete Park Transformation

First element was with Carlo Donnoli from Capital Works, to decommission and demolish existing outdated and non-compliant restroom and replace with a 1D2A compliant amenity building. This included but not limited to design, fabricate, install rough in and connect services. Further reinstate landscape and associated…

Continue reading →

City of Port Phillip, Murphy Reserve shelters

GR has a number of standard pre-engineered shelters available. These are available in a wide range of sizes and materials alike. If none of these quit fits your needs then we can design one that will.

Continue reading →

Barwon Coast Committee, Bridge car park, Barwon Heads

This 2D restroom was designed and constructed where there was no sewer or water available and the environment was sensitive. To manage this the restroom was built over a 50P “Micro Flush” Hybrid “flow to ground” waste management system. The Hybrid system is a low…

Continue reading →

Dandenong City Council, Hemming’s Reserve restroom upgrade

GR won at tender stage the restroom for Hemmings Skate Park. The restroom consisted of a 2D2A restroom configuration which was to comply with the A/S1428.1 Colourbond clad both internally and externally with powder-coated posts and roof frame. Sewer, power and water were rough in,…

Continue reading →

Whittlesea City Council, Hillsview Truss Bridge project

To provide better access, GRDC was called in to design and construct a new pedestrian bridge that would span the inaccessible side of the reserve and provide safe passage for residents. The bridge span extends for 30m with a width of 2.5m. fabricated in three…

Continue reading →

South Gippsland Shire – Tarwin Lower Restroom.

Design and construct of 1D2A restroom at Tarwin Lower to replace the existing out of date facility is a huge improvement on what was there. Roughed in to use existing septic and power supply the amenity was clad in mini-orb both internally and externally with…

Continue reading →

Beveridge Williams – Clarinda Estate foot bridge

GR placed this bridge onto the abutments only last week on behalf of Joanne at Beveridge Williams , bridge consists of 3 spans (10m, 15m, 6m). Bridge was designed to sit above the MW q100 level. Bridge was made up of HDG I-Beams, Steel bearers…

Continue reading →

Campaspe Shire – Kyabram Restroom and shelter project.

There were two parts to this contract that GR secured for Campaspe Shire. First was to strengthen an existing shelter in the reserve with replacing the timber in-ground footings with HDG brackets; the second was too design and construct a restroom to match the shelter…

Continue reading →

Page 16 of 52 ← First ... 14 15 16 17 18 ... Last →