Driven timber piles Pine bearers and joists HWD decking HWD posts and cap-rail with welded infill panels
Driven timber piles Pine bearers and joists HWD decking HWD posts and cap-rail with welded infill panels
1D fully compliant amenity building Colourbond clad Steel wall frames Powder-coated posts and roof framing Powder-coated steel ventilation screens Stainless steel toilet-ware and architectural hardware to A/S 1428.1 Approach path and grab rails to code Rough in and connect sewer and water Solar to roofing…
Replace rotten hardwood bearers and joists with new members Replace of existing pine stringers and stair treads with hardwood New hardwood cap-rail and mid-rail Refurbishment of landings New HDG hardware throughout
Custom skillion shelter, 10m x 5m. Steel, hardwood clad posts. Factory stained pine roof framing. Pine framed hardwood timber decorative shade screen. Colourbond roof BA drawings and engineering certification Installation to footings only through existing granitic slab Leave site clean and tidy
First element was with Carlo Donnoli from Capital Works, to decommission and demolish existing outdated and non-compliant restroom and replace with a 1D2A compliant amenity building. This included but not limited to design, fabricate, install rough in and connect services. Further reinstate landscape and associated…
GR has a number of standard pre-engineered shelters available. These are available in a wide range of sizes and materials alike. If none of these quit fits your needs then we can design one that will.
This 2D restroom was designed and constructed where there was no sewer or water available and the environment was sensitive. To manage this the restroom was built over a 50P “Micro Flush” Hybrid “flow to ground” waste management system. The Hybrid system is a low…
GR won at tender stage the restroom for Hemmings Skate Park. The restroom consisted of a 2D2A restroom configuration which was to comply with the A/S1428.1 Colourbond clad both internally and externally with powder-coated posts and roof frame. Sewer, power and water were rough in,…
To provide better access, GRDC was called in to design and construct a new pedestrian bridge that would span the inaccessible side of the reserve and provide safe passage for residents. The bridge span extends for 30m with a width of 2.5m. fabricated in three…
Design and construct of 1D2A restroom at Tarwin Lower to replace the existing out of date facility is a huge improvement on what was there. Roughed in to use existing septic and power supply the amenity was clad in mini-orb both internally and externally with…